Petrol/LPG and Diesel Engines
Procedure of treating an engine with lubricant capacity of 2 to 10 litres (3 tubes).IMPORTANT! The full treatment means three stage process. You need a set of 3 blisters
Stage 1
Squeeze out the contents of one tube into the lubricant neck of the engine warmed up to the running temperature.
Start the engine and let it idle for no less than 2 minutes.
Stage 2
Do as described in Phase 1 after a running of 60 to 150 miles (100-250 km).
Stage 3
Do as described in Phase 2 after a running of 60 to 150 miles (100-250 km).
Revitalization is considered complete at a mileage of no less than 930 miles (1,500 km).
Note!
DO NOT CHANGE the oil until treatment has been completed!
It is possible to treat at idle: 4 hours are equivalent to a running of 120 miles (200 km).
Treat new engines with one dose: two tubes simultaneously.

Popular Tags
Reduce Friction
Manual Transmission
LPG Engine Recondition
Application Guide
fuel pump recondition
ballbearings recondition
Cylinders Carbon Removal
metal-and-ceramics coating
Gear Box Wear Protection
Cylinders Recondition
What is XADO?
Noble Prize
Wear Protection
Piston Rings Carbon Removal
Information
reconditioning grease
Verylube
Automatic Transmission
Engine Booster
Carbon Free
Carbon C60
Diesel Recondition
certificate
bearings recondition
Transmission Wear Protection
Fullerene
Benefits of XADO
XADO Chemical Concern
Power Booster
Differential Wear Protection
Manual Transmission Wear Protection
Engine Recondition
Water Removal
Fuel Tank Water Removal
xado
Engine Power Increase
Moisture Removal
main bearings recondition
Riffle Barrel Recondition
Petrol Engine Recondition
injector recondition
XADO in Industry

